To add an automatic completion building block to a task path workflow

Parent Previous Next

The procedure to add an automatic completion building block to a task path workflow is as follows:

  1. Prerequisite procedural steps are covered separately in the topic To configure the workflow structure of a task path definition. Refer to these before proceeding to step 2.
  2. With the Path tab activated, use the Version drop-down field to ensure that the correct variant of the task path workflow structure is displayed.
  3. Using the standard 'drag and drop' technique, transfer a new Complete () building block to the design area. The new building block instance appears in the design area, ready for positioning at the logical endpoint of a task path workflow branch 1.
  4. Establish the required connections (joins) to this automatic completion building block component, linking through to the available target node icons () 2. This requisite step is covered separately in the topic To join building block components within a task path workflow.
  5. Click on Save.


Note

1 The outcome of this building block is to automatically complete the case framework component managed through the task path workflow - an ASB category, a Feedback stage, a CRM case, etc.

2 An automatic completion building block cannot be configured as a predecessor component within the task path workflow structure.


See related topics...

Understanding the task path creator

To configure the workflow structure of a task path definition

To add a communication building block to a task path workflow

To add a delay building block to a task path workflow

To add a form building block to a task path workflow

To add a milestone building block to a task path workflow

To join building block components within a task path workflow