The procedure to allocate a contractor to a repair order is as follows:
Tip
1 Where the cumulative cost of all included SOR tasks is below the minimum threshold set for the mapped contract definition, the Actual cost value is automatically inflated to the Minimum order value and a further default SOR code will appear in the Tasks tab to offset the difference.
Note
1 The search facility will automatically return all possible matches for a contact's first name and last name once the Number of characters before an automatic search commences system preference is reached; it will likewise return all possible matches for any corresponding address field.
2 The availability and customisation of all Contact Summary 360 View tiles is controlled separately for each end user via their unique system profile.
3 The feasibility status (Green - Amber - Red - White - Blue) indicates a contractor's availability relative to the target start and completion date period for the order, summarised in the table below.
4 Where the highest ranked contractor is ignored, the end user must submit an override Reason and qualifying Notes.
5 The option Confirm With Appointment will only be active for those contractors with valid diary slots defined within an overarching calendar.
6 For a slot based diary booking system, only continuous slots can be selected; for a time-based system, the duration must be at least equal to the combined standard time of all included SOR codes.
7 Use the Back button to select an alternative contractor; click on an active slot or highlighted time period to deselect it.
Status |
Icon |
Description |
Green |
The next available contractor appointment slot is within the preferred timeframe, based on the assigned repair request priority. |
|
Amber |
The next available contractor appointment slot is outside of the preferred timeframe but still within the target start and completion date period. |
|
Red |
The contractor is available but the appointment slot is outside of the target start and completion date period. |
|
White |
No diary information is available for the contractor that overlaps with the target start and completion date period. |
|
Blue |
The contractor's availability is managed via an external dynamic resourcing schedule. |
See related topics...